Acceptance Criteria Nc; Acceptance Criteria Sfc - Ground (Earth), Line Or Neutral Open - GE B30 Technical Reference Manual

Patient monitor
Hide thumbs Also See for B30:
Table of Contents

Advertisement

(10) Read and record the current leakage indicated on the tester.
(11) Change leakage tester switches to:
(12) Read and record the current leakage indicated on the tester.
(13) Change leakage tester switches to:
(14) Read and record the current leakage indicated on the tester.
(15) Set the power switch of the device to OFF.
(16) Repeat the steps in this procedure using the appropriate SPO2 Test Body. Connect the
SPO2 Test Body to the blue SPO2 connector of the device under test.

2.9.1 Acceptance criteria NC

With Ground and Neutral CLOSED - If reading is greater than 10 µA, the device under test fails.
Contact GE Technical Support

2.9.2 Acceptance criteria SFC - ground (earth), line or neutral open

If any reading is greater than 50 µA, the device under test fails. Contact GE Technical Support.
GND (Earth) - CLOSED
Polarity - NORMAL
Neutral - OPEN
GND (Earth) - CLOSED
Polarity - NORMAL
Neutral - OPEN
GND (Earth) - CLOSED
Electrical Safety Tests
3-11
Document no. 2044677-001

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents