11.3 PSU mains connection and PSG power connection for nominal operation

PSU 5XXX.1XX: 400 to 480 VAC+10% - - 20%, 50 / 60 Hz
PSU 5XXX.2XX: 480 to 690 VAC+10% - - 20%, 50 / 60 Hz
PSU 5100.XXX:
110 A, 35 mm
PSU 5200.XXX:
220 A, 95 mm
Power supply feeder to PSG
PSG 3050:
² 16 mm
PSG 3075:
² 16 mm
PSG 3100:
² 35 mm
PSG 3200:
² 95 mm
1070 078 224- -109
PSU 5000 / PSG 3000
Instructions for Assembly and Operation
2
conductor cross- -section
2
conductor cross- -section
L1
L2
L3
PE
PSU
U
V
2
conductor cross- -section (max. 50 mm
2
conductor cross- -section (max. 50 mm
2
conductor cross- -section (max. 50 mm
2
conductor cross- -section (max. 95 mm
NOTE
Micro--welding:
Insertable pins may be used for mains and transformer terminal connections with
smaller conductor cross--sections, however, plug connectors must be used in this
case.
Part no. of insertable section: 1070 918 779.
All mains connections are led through openings in the
housing cover. There are drilled holes in the front
panel through which the conductor terminals can be
opened or tightened:
PSU 5100.XXX / PSU 5300.XXX: with Allen key
PSU 5200.XXX: with Allen key
Please note:
When the mains voltage has been
switched on, it takes approx. 10 sec.
before the "ready" signal goes on and
supply voltage is available at the timer.
All connections are made through cut- -outs in the
housing bottom. There are drilled holes at the front
panels through which the conductor terminals can be
opened or tightened.
PSU 5100.XXX / PSU 5300.XXX: with Allen key
PSU 5200.XXX: with Allen key
2
)
2
)
2
)
2
)
Connection
11--7