Cleaning The Warmer - GE Panda iRes Warmer Operation And Maintenance Manual

Table of Contents

Advertisement

Cleaning the Warmer

Steps
Lower elevating base (or raise it depending upon bed height) to ergonomically comfortable
1
cleaning position.
Turn bed off at standby power switch.
2
3
Unplug from power outlet.
4
Move bed to cleaning room/area.
If bed was previously on, allow it to cool for at least 30 minutes.
5
6
Obtain usual cleaning/disinfectant solution.
Remove all ancillary equipment (e.g. patient temperature probe, shelves, etc.)
7
8
Empty drawer module.
9
Remove all 4 bedside panels.
Unplug scale if installed.
10
11
Remove the clear Plexiglas plate and mattress from the bed.
Remove scale.
12
13
Remove x-ray tray.
Wipe down component parts of bed and chassis base with recommended cleaning solu-
14
tion per hospital infection control policy. Rinse and dry.
15
Reinstall chemically disinfected component parts in reverse order from breakdown steps.
Chemically disinfect and dry control panel.
16
17
Chemically disinfect and dry dove tail rails.
Chemically disinfect and dry drawer module.
18
19
Chemically disinfect elevating base and legs.
20
Re-plug scale into probe jack panel, if not already done.
Reattach all clean ancillary equipment (e.g. patient temperature probe, shelves, etc.).
21
22
Plug bed into power outlet.
Turn bed on at standby power switch.
23
24
Prepare bed for next admission.
4-4
Panda iRes Warmer
Description
M1110737 006
© 2007 General Electric Company, all rights reserved

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Giraffe

Table of Contents