Installing Power Cables
Introduction to PSUs
PSU (with the plastic
cover removed)
63 A Power Input
PSU PSU PSU PSU PSU EFI PSU PSU PSU PSU PSU
PSU
PSU (with the plastic
cover installed)
M3
2# screwdriver
0.59 ± 0.06 N· m
63 A
WARNING
1.
The label below advises you to read
corresponding manuals before
operating the equipment.
2. The equipment is powered off only
after all power inputs to each PSU
board are disconnected.
CAUTION
Install the OT terminals on the
power cables according to the
instructions on the plastic
cover of each PSU board.
Ensure that the terminals are
installed correctly.
62
M6
3# screwdriver
5.10±0.51 N· m