Preparations For Installing Type A Multi-Purpose Fiber Management Cabinets - Huawei OptiX OSN 9800 U32 Enhanced Subrack V100 Quick Installation Manual

Hide thumbs Also See for OptiX OSN 9800 U32 Enhanced Subrack V100:
Table of Contents

Advertisement

Installing Type-A Multi-Purpose Fiber Management Cabinets
8.2

Preparations for Installing Type A Multi-Purpose Fiber Management Cabinets

Determining the Installation Position for the Multi-Purpose Fiber
Management Cabinets
Installation Holes
Multi-purpose fiber
management cabinets U32Enhanced
Attach a plumb line on the cable rack above the multi-
purpose fiber management cabinets to be installed. Use
a marker to mark the point where the plumb bob
contacts the floor.
Repeat step 1 to mark another point on the floor.
Then draw a line between the two points using a
powder marker.
NOTE
The positioning method is for reference only. The actual
installation position depends on the project engineering
drawing.
Concrete Floor : Determining the Installation Holes
Mark the installation holes on the
floor using a marker.
300
600
300
198
61
31
Back
Line-drawing
Template
Front
80
300
Unit: mm
300
Unit: mm
300

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents