Epson C12 Series Manipulator Manual page 200

6-axis robots
Hide thumbs Also See for C12 Series:
Table of Contents

Advertisement

Maintenance 5. Joint #1
Installation: Joint #1 Electromagnetic brake (M/C Cable Downward)
1. Install the Joint #1 brake to the brake plate.
Hexagon socket head cap bolts: 3-M4×25
Tightening torque: 4.0 ± 0.2 N·m
Be careful of the assembly direction of the Joint #1
electromagnetic brake. (See the photo)
2. Mount the Joint #1 brake plate to the Joint #1 motor unit.
For details, refer to Maintenance: 5.1.1 Joint #1 - Replacing the Motor (M/C Cable Backward),
Installation step (4).
3. Install the brake power supply to the plate.
Make sure to install the brake power supply so that the cables
will be in the direction as shown in the photo.
Cross recessed head screws with washer: 2-M3×6
Tightening torque: 0.45 ± 0.1 N·m
4. Connect the M/C cable connectors.
Connector: X11, X010, BT1, BR011
5. Install the following covers.
Connector plate (M/C cable downward)
Base cover (M/C cable downward)
Base maintenance cover
For details, refer to Maintenance: 3 Covers.
NOTE
If you disconnected the connector BT1 in the removal steps, perform calibration.
186
C12 Rev.3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

C12-a1401 seriesC12xl

Table of Contents