Siemens SIPROCESS GA700 Operating Instructions Manual page 57

Continuous gas analysis wall-mounted device
Hide thumbs Also See for SIPROCESS GA700:
Table of Contents

Advertisement

Figure 6-2
Procedure
1. Drill four holes into the wall.
The dimensions for the drill holes are specified in the drilling pattern.
2. Insert the anchors in the drilled holes.
3. Position the wall-mounted device on the wall and fasten it with the screws.
Wall-mounted device
Operating Instructions, 05/2018, A5E31930403-06
Dimensions with open wall-mounted device
Installing the device
6.3 Installing the wall-mounted device
57

Advertisement

Table of Contents
loading

Table of Contents