KIT
3-94
3.
Align bolt holes in CHS BASE UNIT (see
Spacing Guide on page
using four anchor bolts.
4.
Align and install the CHSG LARGE BATT BOX on top of the CHS
BASE UNIT.
Figure 3-118 Installing the CHSG LARGE BATT BOX using the CHS2UG JOINT BRACKET
5.
Secure the CHSG LARGE BATT BOX to the CHS BASE UNIT using
the CHS2UG JOINT BRACKET KIT. Refer to
the CHSG LARGE BATT BOX using the CHS2UG JOINT BRACKET
KIT.
8.2.2
Battery Installation
1.
Loosen screw on front of CHSG LARGE BATT BOX.
Figure 3-119 Removing CHSG LARGE BATT BOX Cover
2.
Swing cover outward and detach from CHSG LARGE BATT BOX.
Figure 3-117 Floor Mount
3-93) with holes drilled in floor and secure
Figure 3-118 Installing
Installing the SV9100 Chassis
Issue 3.0