Bosch e-GoKart PowerTrain Young Star Manual page 25

Table of Contents

Advertisement

Component Description | 4
Rack installation via 4x M6 screws at the bottom plate of the Charger Energy Storage
5-1.2.
Screws shall only be mounted into clean screw threads of the BOSCH MOTORSPORT e-
GoKart System components.
No additional limitation concerning orientation and mounting angle
Illustration 21: Mechanical dimensions and interfaces
4.5.1 Usage
Intended Use
Battery charging using a offboard fleet Charger Energy Storage CH 5-1.2 shall be handled
by trained professionals (instructed persons) only. Their training has cover the relevant
subjects in this document and should be documented appropriately. The "battery swap"
procedure on the vehicle shall also be performed by instructed persons but will not be
covered in this document.
# Responsibility for correct pairing of batteries (same balancing level and SOH) is on
OEM/User side.
The Charger Energy Storage CH 5-1.2 is designed to be continuously AC supplied. The AC
supply may have to be removed in error conditions. After establishment of the AC supply,
the Charger Energy Storage CH 5-1.2 can take up to 6 s to be operational.
The Charger Energy Storage CH 5-1.2 can handle up to 2 Energy Storages ES 5-2.4 in par-
allel operation.
A cable harness with two battery connectors may only be used in conjunction with two
Energy Storages ES 5-2.4, i.e. no partial operation with an open terminal is permitted.
Bosch Motorsport
e-GoKart_Powertrain__Young_Star__Manual
25 / 60

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents