GE C70 Instruction Manual page 209

Capacitor bank protection and control system ur series
Hide thumbs Also See for C70:
Table of Contents

Advertisement

5 SETTINGS
5.2 PRODUCT SETUP
5
Figure 5–16: USER-PROGRAMMABLE PUSHBUTTON LOGIC (Sheet 2 of 2)
User-programmable pushbuttons require a type HP or HQ faceplate. If an HP or HQ type faceplate was ordered
separately, the relay order code must be changed to indicate the correct faceplate option. This can be done via
EnerVista UR Setup with the Maintenance > Enable Pushbutton command.
NOTE
GE Multilin
C70 Capacitor Bank Protection and Control System
5-85

Advertisement

Table of Contents
loading

Table of Contents