Installation Manual
For Mounting on a Stand (Sold
Separately)
1.
Hang the elite Panaboard on the stand with the
screw heads.
2.
Secure the elite Panaboard to the stand frame
using the two-wing bolts (M5 ´ 12 mm [
[2 count]) included with the stand.
46
Operating Instructions (For Basic Operations)
Note
•
elite Panaboard
-100 mm (-3
Standard
+100 mm (+3
+200 mm (+7
3.
Wipe the screen board surface.
Gently wipe the screen board surface with a soft,
moist cloth.
/
in.]
1
2
Notice
•
4.
Confirm that the elite Panaboard can operate.
See "Confirming the elite Panaboard
Operation" (page 47).
When installing the elite Panaboard on the
stand, you can adjust its height to 4 different
levels.
When changing the height, remove the left
and right screws from the back of the elite
Panaboard, and securely insert them at the
desired height. Torque (greater than 1 N·m
[10 kgf·cm (9 lbf·in.)]).
Screw Position
Height
/
in.)
7
8
/
in.)
2nd from bottom
7
8
/
in.)
7
8
Do not use thinner, benzene, or abrasive
chemicals to clean.
(Doing so can result in discoloration.)
Highest
2nd from top
Lowest