Power On Procedure (1)
The ETERNUS DX S2 systems can be Powered On directly
from the Controller Enclosure
Push the Power Switch
•
The "Power" LED of the CE switches on
•
The power on sequence takes about 2 minutes
•
If everything is OK, the green Ready LED in
the CE and the green Power LED in the DE
switch on
Power O
Fault
O
Active O
Power
Ready
Fault
Maint/ID O
Cache
Hardware Installation
ETERNUS DX80 S2 and DX90 S2
O
O
O
O
15
Copyright Fujitsu Technology Solutions, Release August 2011