Download Print this page

Advertisement

Quick Links

BOILER INSTALLATION INSTRUCTIONS FOR
INSTALLATION INSTRUCTIONS
General Instructions:
The STREBEL CIS & CIS boilers are special boilers for light oil or gas-
fired (forced) burners. They can be fitted in hot water heating
installations or low pressure steam installations, depending on the type.
Operating Conditions:
Hot water Heating installations boiler type
Maximum high limit temperature 110ºC
Maximum Operating Temperature 95°C
Maximum working pressure 4 bar
Please note all relevant instructions when assembling the boilers.
The Installation: The connecting and initial setting in operation should
be carried out by a qualified heating specialist.
The boiler base is to be constructed in accordance with our diagrams.
Advantages of the STREBEL CIS AND CISM:
1.
Long life of cast iron boiler body.
2.
High efficiency of operation. Efficiency of combustion is higher
than 90.5 % for all kinds of fuels.
3.
Possibility of delivery with burner.
4.
Modern design.
5.
Signalling of operation and defect of boiler.
6.
It is possible to order a special variation of the boiler allowing a
water temperature of 115ºC (standard delivery is with boiler
water temperature up to 95ºC).
7.
The ability to use a modular arrangement of connection.
8.
Delivery fully assembled or in part form according to customer
requirements is available.
9.
Door can be mounted to swing from either side (must be
specified in order).
10.
Easily visible sight glass for viewing flame or
combustion chamber pressure.
STREBEL CIS
STREBEL CISM
for reading
STREBEL CIS BOILERS
STREBEL CISM BOILERS
STREBEL CIS BOILER
V.1 - 03.08

Advertisement

loading
Need help?

Need help?

Do you have a question about the CIS and is the answer not in the manual?

Questions and answers

Summary of Contents for Strebel CIS

  • Page 1 STREBEL CISM BOILERS INSTALLATION INSTRUCTIONS General Instructions: The STREBEL CIS & CIS boilers are special boilers for light oil or gas- fired (forced) burners. They can be fitted in hot water heating installations or low pressure steam installations, depending on the type.
  • Page 2: Maintenance

    STREBEL CIS ASSEMBLY INSTRUCTIONS FOR: STREBEL CIS INDEX : PAGE ASSEMBLY TOOLS BOILER BASE TECHNICAL DATA 4 & 5 BOILER ERECTION WALL CLEARANCES COMPONENTS REQUIRED IMPORTANT ASSEMBLY ADVISE BOILER ASSEMBLY BOILER BLOCK 8 & 9 FIXTURES BURNER DOOR UPPER FLUE-WAY DOOR...
  • Page 3 A bar Pulling up tool, which is returnable after assembly has been successfully completed, is made available for assembling the boiler block. The complete pulling up kit CIS/CISM consists of the following: Pulling up flange at the top rear section...
  • Page 4 STREBEL CIS ASSEMBLY INSTRUCTIONS FOR: STREBEL CIS Page 4 V.1-03.08...
  • Page 5 STREBEL CIS ASSEMBLY INSTRUCTIONS FOR: STREBEL CIS STREBEL CIS Series - Connection Dimensions 125mm 80mm 275mm STREBEL CIS BOILER 1355mm 945mm 1185mm 670mm 95mm Flow & Return connections 80mm I.d pipe Flue spigot 220mm Mating weldneck flanges outside diameter supplied Page 5 V.1-03.08...
  • Page 6 STREBEL CIS ASSEMBLY INSTRUCTIONS FOR: STREBEL CIS STREBEL CISM – TECHNICAL DATA No. of Sections Nominal Output Nominal Input Efficiency 91.5 Fuel Consumption: Natural Gas m³/hr 36.1 43.9 51.4 60.2 71.1 82.3 Extra Light Heating Oil kg/hr 30.2 36.8 43.1 50.5...
  • Page 7 STREBEL CIS ASSEMBLY INSTRUCTIONS FOR: STREBEL CIS Boiler erection. Wall clearances. There must be free space around the boiler to access the boiler for servicing purposes. The space in front of the boiler must be of distance equal to 1.5 times the depth (L).
  • Page 8 STREBEL CIS ASSEMBLY INSTRUCTIONS FOR: STREBEL CIS Important Assembly Advice: Please read through before starting the assembly! The boiler is normally delivered in individual sections, which are assembled as a boiler block by means of tapered nipples. The watertight joint between two boiler sections is a high-precision press fit between the boiler nipple and nipple port.
  • Page 9 STREBEL CIS ASSEMBLY INSTRUCTIONS FOR: STREBEL CIS Assembly of the boiler block from individual sections Starting with the rear section to the front, the boiler block is assembled on the boiler base. 1. Erect and support the rear section (A).
  • Page 10 STREBEL CIS ASSEMBLY INSTRUCTIONS FOR: STREBEL CIS Front view showing the first three intermediate sections after ‘pulling up’. Front view showing complete boiler block without the burner door or flue pass door. Rear view of the complete boiler block. Page 10...
  • Page 11 STREBEL CIS ASSEMBLY INSTRUCTIONS FOR: STREBEL CIS Assembly of fixtures 1. Fit 2” plug into the bottom tapping on the front section of the boiler (A). 2. Fit the 2” x 1/2” bush to the upper tapping of the boiler front section for the thermostat pocket (B+C).
  • Page 12 STREBEL CIS ASSEMBLY INSTRUCTIONS FOR: STREBEL CIS Completed boiler block with burner door and flue pass door hinged on the right. Front view showing the side jackets and the doors bolted closed. Top view showing insulation prior to fitting the top jacket.
  • Page 13 STREBEL CIS ASSEMBLY INSTRUCTIONS FOR: STREBEL CIS Instrument control panel assembly. Description of the instrument control panel Instrument control panel OS-04 consists of the following parts: → Instrument panel casing. → Altitude (pressure) sensor. → Thermometer. → Stage 1 control thermostat.
  • Page 14 STREBEL CIS ASSEMBLY INSTRUCTIONS FOR: STREBEL CIS Page 14 V.1-03.08...
  • Page 15 STREBEL CIS ASSEMBLY INSTRUCTIONS FOR: STREBEL CIS Page 15 V.1-03.08...
  • Page 16: Fault Finding

    STREBEL CIS ASSEMBLY INSTRUCTIONS FOR: STREBEL CIS Before start-up check whether: Hazards: • Operate the boiler at a maximum temperature of 95ºC. If the 1. There is sufficient water in the boiler and the heating system; boiler overheats as a result of incorrect operation, switch the the pointer on the altitude (pressure) gauge is in the green burner off immediately.
  • Page 17 STREBEL CIS ASSEMBLY INSTRUCTIONS FOR: STREBEL CIS THE COMPANY RESERVES THE RIGHT TO CHANGE SPECIFICATIONS AND DIMENSIONS WITHOUT NOTICE STREBEL LTD 1F ALBANY PARK INDUSTRIAL ESTATE FRIMLEY ROAD, CAMBERLY SURREY GU16 7PL TELEPHONE : (01276 685422) FAX: (01276 685405) E-mail address: info@strebel.co.uk Website: www.strebel.co.uk...

This manual is also suitable for:

Cism