Explanations of symbols and signs on the Control Tower display. Operation indication (in the first display position by technical read out) No heat requirement Ventilation phase Ignition phase Burner active on central heating Burner active on hot water Fan check Burner off when room thermostat is demanding Pump overrun phase for central heating Pump overrun phase for hot water...
Content Declaration of conformity ......................3 Introduction ..........................4 Regulations ..........................4 Scope of the supply ........................6 Description of the boiler ....................... 6 Mounting the boiler ........................6 Dimensions ........................7 Connecting the boiler ........................9 Central heating system ..................... 9 Expansion vessel ......................
The current, Electricity at Work Regulation must be complied with and also be in accordance with the relevant and current editions of the British Standards. The STREBEL S-HQ boiler is a certified appliance and must not be modified or installed in any way contrary to this Installation Manual.
Page 5
The STREBEL S-HQ is a central heating unit with an optional integrated hot water function. These units must be connected according to these instructions and all installation norms in respect of the part of the unit to be connected. Observe the following rules of safety: All work on the unit must take place in a dry environment.
Fixing material consisting of plugs and screws; Description of the boiler Room sealed boiler The STREBEL S-HQ boiler is a room sealed, condensing and modulating central heating The boiler retreives its boiler, with or without an integrated hot water facility. combustion air from...
Mounting the boiler The room where the boiler will be placed must always be frost free. It is NOT necessary to have a purpose provided air vent in the room or internal space in which the boiler is installed. Neither is it necessary to ventilate a cupboard or compartment in which the boiler is installed, due to the extremely low surface temperature of the boiler casing during operation.
A low velocity header must be connected to the Q51C, Q51S and Q60S to prevent flow problems over the boiler. STREBEL supplies the AA1OV09U Low velocity header for 1 boiler. This can be connected directly under the boiler on the flow and return pipe.
Expansion vessel The central heating system must be provided with an expansion vessel. The expansion vessel which is used should be geared to the water content of the installation. The pre- charge pressure depends on the installation height above the mounted expansion vessel. See table 4.
By this means the external expansion vessel is not required. This expansion vessel module is placed behind the STREBEL S-HQ boiler, by which means the expansion vessel is not noticeable. The content of the two expansion vessels is 20 litres.
Make sure that the gas pipe work does not contain dirt, particularly with new pipes. When the boiler has to be converted from natural gas to LPG, STREBEL provides special kits for this purpose. Special instructions are supplied with the kit.
Condensation drain pipe STREBEL boilers produce condensate. This condensate must be drained otherwise the boiler will not function. The collecting condensation drain pipe should be connected to the drain by means of an open connection. By this means the possibility of drain gases ending up in the boiler is prevented.
6.7 Flue gas exhaust system and air supply system The flue gas exhaust system and air supply system consists of: Flue gas pipe; Air supply pipe; Roof or wall terminal. The flue gas exhaust system and air supply system must comply with: The flue gas outlet and air supply installation must comply with the current regulation requirements.
Page 17
Monopass Flue systems. The STREBEL flue gas system is meant and designed solely the use on STREBEL central heating boilers adjusted for Nat gas or LPG. The maximum flue gas temperatures are below 70°C (full load 80/60°C)
Page 18
In certain weather conditions condensation may also accumulate on the outside of the air inlet pipe. Such conditions must be considered and where necessary insulation of the inlet pipe may be required. In cold and/or humid weather water vapour may condense on leaving the flue terminal. The effect of such ‘plumeing’...
40 – ( 2 x 1.1 ) = 37.8 meters. Pipes with 60/100 diameter are only permitted on wall terminals in combination with STREBEL boilers untill 25kW. Two pipe flue system + chimney lining in m in m ø80mm...
External hot water cylinders Depending of the comfort preferences different external hot water cylinders can be connected to the boiler. The choice of the cylinder depends on the coil output. The coil output must comply with the boiler output. A cylinder which is used in combination with aQ 51S of Q 60S, should have a minimal capacity of 40 kW respectively 45kW (minimal ø28mm coil).
All connections should be designed in accordance with the enclosed regulations.; Should it be necessary to change it, the mains power supply cable may only be replaced with an STREBEL mains power supply cable (item No. S4407300). The STREBEL room thermostat and controls must be connected to their allocated connections.
Boiler controls The boiler is provided with a fully automatic microprocessor control, called CMS Control Management System. This control simplifies operation by undertaking all major control functions. Initially when power to the unit is switched on it will remain on standby.
Explanation of the function keys Central Heating programme key. Switching the Central Heating on or off (Led on/off); Hot Water programme key. Switching the Domestig Hot Water (DHW) facility on or off (Led on/off); PC programme key. adjusts the pump to continuous water circulation in the central heating system (Led on), or according to the pump overrun times on the relevant programs (Led off);...
10 Filling and venting the boiler and installation The central heating installation needs to be filled with potable water. For filling or topping up the installation you use the filling loop according to the following procedure: 1 Switch on the power supply; 2 The diplay will show FILL;...
11 Commissioning the boiler Before the boiler is fired, ensure that the boiler and the system are well vented and free of air. Purge the gas line between the gas meter and the boiler and carry out a gas soundness test as specified in the current Gas Safety Regulations. The boiler does not require adjustment of the burner pressure and air quantity because it is self adjusting and is factory set at the correct value.
Lower flow temperature More boilers in Cascade, i.e.. Read through the Parameter chapter to adjust the boiler to its installation. Contact STREBEL Ltd. in case of doubt. Please follow next procudere to alter adjustments: Altering adjustments Press the Mode-key for 5 secondss.
Isolating the boiler In some situations it may be that the entire boiler must be switched off. By switching off the three keys with the lamps for central heating, hot water and pump programme ), the boiler is switched off. Leave the plug in the wall socket, which means the circulation pump and the three-way valve are activated once every 24 hours in order to prevent jamming.
Turn the upper measuring nipple on the gas valve open (fig. 12); Connect the hose of the digital pressure gauge to the upper measuring nipple of the gas valve Press the + key until the maximum value is achieved; The fan will function to its maximum revolutions (burner stays off) Measure the under pressure and write down this value.
13.3 Checking the CO The CO percentage is factory-set. This has to be checked at commissioning, maintance and faults. This can be checked by means of the following procedure: Remove the black cover of the gas valve by unscrewing the sealed screw. Put the boiler into operation and take care that it can deliver its heat;...
14 Maintenance Maintenance or changes to the unit may only be carried out by an authorised technician. 14.1 The frequency of maintenance We advise to carry out an inspection/overhaul to the boiler every year, but at least after two years and an overhaul every four years, depending from the running hours mentiond in the warranty conditions.
Ignition electrode The replacement of the electrode is only necessary when the electrode is worn off. This can be checked by measuring the ionisation current. The minimum ionisation current has to be higher the 4µA on full load. If the viewing glass is damaged the complete electrode must be replaced. Replacement goes as follows: remove the electrical connections of the electrode;...
17 Installation examples 17.1 Radiator installation without thermostatic radiator valves installation example figure 16 A Boiler: Connection terminal Strebel Q-boiler BrainQ thermostat Outside sensor ARV12 Thermostatic radiator valve By-pass Use alway a by pass in combination with thermostatic radiator valves.
17.2 Radiator installation with underfloor heating zone installation example figure 17 A Boiler: Connection terminal Strebel Q-boiler Outside sensor ARV12 MadQ zone controller 23BC Connection terminal MadQ built in B Cylinder: Cylinder sensor Three-way valve cylinder C Direct zone: Pump direct zone...
18 Error indication A detected error is indicated on the display by means of blocking or error messages. A distinction should be made between these two messages due to the fact that blocking can be of a temporary nature, however, error messages are fixed lockings. The control will try its utmost to prevent locking and will temporarily switch off the unit by blocking it.
Page 43
STREBEL LTD. • Albany park industrial estate • Frimley road, Camberley • Surrey GU15 Telephone: (01276) 685422 • Fax: (01276) 685405 • E-mail: info@strebel.co.uk • Internet: www.strebel.co.uk E. & O. E.
Need help?