Cr Unit/Timing Belt - Epson Stylus C58 Service Manual

Color inkjet printer
Table of Contents

Advertisement

Epson Stylus C58/C59/ME 2/C79/D78/C90/C91/C92/D92/T20/T20E/T23/T26/S20/T10/T11/ME 30/T21/T24/T27/S21

4.5.5 CR Unit/Timing Belt

Part/Unit that should be removed before removing CR Unit/Timing Belt
Upper Housing /Hopper /Print Head /Ink System (Cap Assy)/CR Scale/CR Motor
After releasing the Timing Belt, temporarily secure the belt to the
C A U T I O N
Cartridge Cover with a tape or the like so as not to allow the grease
to come in contact with the Timing Belt. Contaminating the belt
with grease can result in malfunction of the printer.
Removal Procedure
CR Unit Removal
1.
Remove the screw (x1), and remove the CR Scale Holder.
In the case of Epson Stylus C58/C59/ME2
Remove the screw (x1), and remove the CR Scale Holder and the CR Unit Stopper.
2.
Remove the CR Unit by sliding it in the direction of the arrow.
CR Unit
CR Scale Holder
Figure 4-27. Removing CR Scale Holder
Timing Belt Removal
1.
Remove the Timing Belt from the groove of the CR Unit.
Timing Belt
Figure 4-28. Removing Timing Belt
DISASSEMBLY/ASSEMBLY
CR Unit Stopper
CR Scale Holder
Epson Stylus C58/C59/ME2's Case
±
C.B.S 3X6 (Torque: 8
1Kgf.cm)
.
Groove of CR Unit
Disassembling Printer Mechanism
Insert the wavy-surface part of the Timing Belt into the groove
of the CR Unit.
Routing the Head FFC differs from model to model, therefore
make sure to refer to the routing procedure of corresponding
model.
Epson Stylus C79/D78/C90/C91/C92/D92:
Epson Stylus C58/C59/ME 2:
Epson Stylus T20/T20E/T23/T26/S20/T10/T11/ME 30/T21/
T24/T27/S21:
Epson Stylus C79/D78/C90/C91/C92/D92's Case
1.
Put the Head FFC through the Hole of the Main Frame.
Main Frame
Ribs
Figure 4-29. Installing Head FFC (1)
2.
Secure the Head FFC with Rib A, and C.
Ribs
Head FFC
Figure 4-30. Installing Head FFC (2)
>>To be continued to the next page.
Revision E
p 48
p 49
p 50
Head FFC
Hole
48
Confidential

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents