Island Installation
Preparation
CONSTRUCT CEILING SUPPORT (for Island Installation)
Plan the Location of the Hood and Ductwork
The ceiling structure must be capable of supporting
the
weight of the insert sleeve (approximatelu
!00 pounds)
and anu inadvertent
user contact loads.
• Use a plumb bob to check the location, The
countertop/cooktop
below the insert sleeve must be
centered with the insert sleeve.
The insert sleeve should extend beuond the front and
rear edge of the cooking appliance,
Align with
center of
cooktop
Ceiling
Hood
ducting
centerline
Front
t
30" Min,
36" Max.
installation
i
i height
j
Cooktop
,
i
_-_
Countertop
The insert sleeve in the ceiling must be centered left
to right over the cooktop,
30"'Min.
36" Max.
installation
height
I
Side view
I
I
13