Assembling The System - Pioneer RM-V1000NU Technical Manual

Multi projection system
Table of Contents

Advertisement

4. ASSEMBLING THE SYSTEM

(1) Assembling the system
[1] Before moving the system to where it is to be installed, insert three Mickey bolts into the main unit.
[2] Secure the shield and the shield S to unit L with the scrivet (six parts).
[3] Move units R and L to the place where the system is to be installed.
Move the units closely together, adjust so that the levels of their frames are equal using the floor leveler,
and adjust the guide pins in front and back to the holes. (Four) Pay attention to the sides of the upper panel.
[4] Tighten units R and L using the hexagonal bolts (two in front and one at the back) containing the spring
washers and washers.
[5] Mount one screen at a time from the bottom.
Place the screen on the front panel, and then while one person holds the screen in front so that it does not
turn over, another person attaches the Mickey bolts from the back. (two parts)
[6] The screen should be mounted by two persons as above.
[7] Attach the scrivets at the left side (12 parts) and bottom side (16 parts) of the screen.
[8] Paste the logo sticker on the front panel.
[1] [2] [3]
A
Attaching
the shields
Shield S
Floor leveler
Mickey bolts
Sides of the
upper pannel (A)
Scrivet (for shield)
Shield
A
Guide
pin
Scrivet
(for screen)
(Fig.3-7)
INSTALLATION AND ASSEMBLY
Mickey bolts
[4] [5] [6] [7] [8]
Hexagonal Bolt
Spring
washer
washer
Screen
Scrivet
(for screen)
Logo sticker
29

Advertisement

Table of Contents
loading

Table of Contents