Deck Installation - Cub Cadet RZT50 Operator's Manual

Rzt series tractor
Hide thumbs Also See for RZT50:
Table of Contents

Advertisement

Available languages

Available languages

5_
6.
Lower the deck to the ground
using the deck lift handle.
Locate the LH and RH deck support
pins on each side of the
deck. Pull the deck support
pins outward
and lock in the
disengaged
position
to release the deck from the tractor's
LH and RH deck lift arms. Refer to Fig. 7-6.
Rear Deck
Deck Lift Arm
Hanger
Bracket
I
Deck
Support
_'\
Rear Hanger
Pin
Bracket
Slot
Figure
7-6
8_
Raise the deck lift arms out of the rear hanger bracket slots
by raising the deck lift handle on the tractor
to its highest
position.
Refer to Fig. 7-6.
Slide the deck forward
so that the deck front
hanger rod
can be lifted out of the two slots of the front deck bracket.
After lifting
the front hanger rod out of the slots, slide the
deck rearward
so that the rod can no longer engage
the
slots.
9.
Using care to prevent
the front hanger rod from falling
back into the deck bracket slots, carefully
slide the cutting
deck (from the right side) out from underneath
the tractor.
DeckInstallation
To install the mower deck, proceed as follows:
1.
While holding
the deck front hanger rod upward,
carefully
slide the deck underneath
the right side of the tractor.
2.
While still holding
the front hanger rod, slide the deck
forward
until the front hanger rod can be lowered
into the
slots of the front deck bracket.
3.
Lower the front ha nger rod into the slots of the front deck
bracket, then slide the deck rearward.
4.
Maneuver
the deck so that the slots in the two rear deck
hanger brackets
approximately
align with the deck lift arms
of the tractor. Refer to Fig. 7-6.
5.
Use the tractor
deck lift handle to lower the deck lift arms
into the slots of the rear deck hanger brackets.
6.
Pull the deck support
pins outward
and maneuver
the deck
as necessary to align the holes in the deck lift arms with the
pins. Refer to Fig. 7-6.
7.
When aligned,
push each pin fully inward
through
the lift
arms to secure the arms in the rear hanger bracket slots.
8.
Make certain the 'V' belt is in the spindle
pulleys on the
deck; then route the belt rearward
beneath
the tractor
frame, above the transmission
tube(s), to the PTO pulley on
the bottom
of the engine.
Install the 'V' belt onto the PTO pulley using one of the
following
two methods.
WARNING!
The muffler
at the rear of the tractor
may be extremely
hot, and could cause serious
burns. Use extreme
caution
when near the muffler.
Allow the muffler
to fully cool before installing
the
belt.
Using
1.
2_
3.
4.
the Idler Pulleyto Tension the Belt.
Using the deck lift handle, raise the deck to the position
that provides
the most horizontal
run of the belt between
the deck idler pulleys and the PTO pulley on the bottom
of
the engine.
Install the belt in the PTO pulley on the bottom
of the
engine.
Route the backside
of the belt around the fixed idler pulley
of the deck. Refer to Fig. 7-4.
Working
from the middle
of the tractor, pivot the idler
bracket/movable
pulley rearward
against the spring
tension
and slide the backside
of the belt onto the movable
idler pulley. Refer to Fig. 7-4.
SECTION 7 -- SERVICE
31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents