Checking Before The Installation; Installing The Emma - Huawei EMMA Pro User Manual

Energy management assistant
Table of Contents

Advertisement

EMMA-(A01, A02)
User Manual

4.3 Checking Before the Installation

Figure 4-2 Packing list
Check
Item
Outer
package
Delivera
ble

4.4 Installing the EMMA

Context
Install the EMMA on the DIN 35 mm standard guide rail of the AC power
distribution box in which a surge protective device must be configured.
Procedure
Step 1 Clamp the EMMA onto the DIN 35 mm standard guide rail from bottom to top,
and push the EMMA upwards.
Step 2 Fasten the EMMA to the guide rail.
Issue 05 (2024-01-19)
Check Criteria
Before unpacking the product, check the outer packaging for
damage, such as holes and cracks, and check the product model. If
any damage is found or the model is not what you requested, do not
unpack the product and contact your vendor as soon as possible.
Check the number of deliverables according to the packing list and
check whether there is any obvious external damage. If any part is
missing or damaged, contact your vendor.
Copyright © Huawei Digital Power Technologies Co., Ltd.
4 Installation
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Emma-a01Emma-a02

Table of Contents