Samsung AC Series Install Manual page 43

Led display
Hide thumbs Also See for AC Series:
Table of Contents

Advertisement

4. FRAME installation and cable connection
⑪ Check the operation of each ASSY BRACKET P-FRONT installation.
- Connect the power of the SET power cord to check whether the entire LED is damaged or not and check the output.
Fig.2 Check the operation after installing two
Fig.1 Check the operation after installing one
Fig.3 Check operation after installing three
Fig.4 Check operation after installing four