Samsung AC Series Install Manual page 42

Led display
Hide thumbs Also See for AC Series:
Table of Contents

Advertisement

4. FRAME installation and cable connection
⑪ Check the operation of each ASSY BRACKET P-FRONT installation.
-
Be sure to read the following precautions when lifting the cabinet for cable connection.
- If the two cabinets are lifted completely attached, there is a possibility of module damage due to collision between modules. (Fig1.)
- Be sure to lift it with a gap of more than 5mm left and right.
- If the module is not broken and simply deviated, Appendix1. Reassemble by referring to module disassembly/assembly method.
CABINET 1
CABINET 2
Fig1. Module collision between cabinets
Module disassembly due to
collision between cabinets
41
More than 5mm
Fig2. Lift after making GAP
LED R&D Lab(VD)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lh015iac series

Table of Contents