4. FRAME installation and cable connection
② Remove the protective packaging of the rear docking portion.
(To work by lying on a table or packaging material.
Caution because it can shock the protruding part when working while standing)
(1) Open the AL shielding bag of the docking part.
(Fig.1)
(1) Remove the front protection PAD fixed to the docking part.
(Fig.2)
(2) Remove the protective FOAM attached to the corner of the four sides of the docking part.
(fig.3)
- Remove the tape that holds both materials.
FOAM
AL shielding bag
EPE PAD
Fig.1 remove AL shielding bag
Fig.2 remove EPE PAD
Fig.3 remove FOAM
26
LED R&D Lab(VD)