Installation; Installation Precautions; Testing Safety Functions - ABB Tina 10B Product Manual

Adapter unit
Hide thumbs Also See for Tina 10B:
Table of Contents

Advertisement

4

Installation

Attach the cable or device to the M12 connector on Tina.
Gently hold the Tina unit to the mounting surface and attach the unit using an M4 bolt.
See max. tightening torques in chapter "Technical data".
4.1

Installation precautions

Warning! All safety functions shall be tested before starting up the system.
4.2

Testing safety functions

After each step the status of the input can be read on the monitoring device.
Steps for testing
1. Interrupt the DYNlink safety
circuit before the unit to be
tested
2. Close the DYNlink safety
circuit
3. Interrupt the DYNlink safety
circuit (e.g. put a hand between
Orion receiver and transmitter)
2TLC010042M0201 Rev.C
LED indication
Green/red flashing
Green
Red
DYNlink signal output
Shall go low
Shall generate a DYNlink
signal
Shall go low
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tina 10aTina 10c

Table of Contents