FusionSolar Smart PV Solution-Device Replacement
Commissioning Guide
Figure 6-2 Replace Device
----End
6.1.2.2 Third-party Management System
Replace the Smart Dongle based on the requirements of the third-party
management system.
6.2 Replacing SDongleA-05 (WLAN-FE) with
SDongleA-05
6.2.1 SDongleA-05 Settings
Prerequisites
The new Smart Dongle has been installed on the inverter and the inverter has
been powered on.
Issue 01 (2021-04-30)
Copyright © Huawei Technologies Co., Ltd.
6 Replacing a Smart Dongle
33