Extract the disconnection crank from its housing See Figure 33.
5.
Press the lock pushbutton and fit the handle into the moving part. In this phase, the moving part
will still be in the DISCONNECT position. See Figure 34.
Figure 33
6.
Keep breaker pushed. Turn the crank clockwise until the pushbutton comes out and the indicator
shows that the circuit-breaker is in TEST position. See Figure 35.
Figure 35
7.
Press the lock button and then rotate the crank clockwise until the button comes out and the
indicator shows that the circuit-breaker is in the CONNECT position. See Figure 36.
Figure 36
2
Figure 34
1
2
2
ABB | SACE Emax 2
1
1