2.
Connect the 2 coolant hoses that were
previously installed to the heater box to their
appropriate ports on the water valve with 2 band
clamps
(Figure
21).
Note:
If a BOSS snowplow is installed on the
machine, route the heater core lower hose
(Figure
21) around the plow solenoid.
3.
Connect the previously shortened thermostat
bypass hose to the water valve with a band
clamp
(Figure 21
and
4.
Connect the remaining hose to the water valve
with a band clamp, then connect the other end of
the hose to the large port on the upper reservoir
with a band clamp
Figure 21
1. To the heater core lower

hose

2. From the thermostat
bypass hose
Figure
22).
(Figure 21
and
Figure
22).
3. To the upper reservoir
large port
4. To the heater core upper
hose
1. Coolant tank
2. Coolant hoses (3)
g460521
12
Figure 22
3. Water valve
4. Existing coolant hose
(previously removed
from coolant tank and
shortened)
g460460