Table 3-1 Cables
No.
Cable
1
PE cable
2
AC input
power
a
cable
3
UPS cable
bundle
4
SACU cable
bundle
5
(Optional)
Tracking
system
power cable
6
(Optional)
Site
auxiliary
power
supply cable
7
Cabinet G1
cable
8
Cabinet G3
cable
Note a: The AC input power cable can connect to a 300 mm
restrictions are as follows:
● Outer diameter of a single-core cable ≤ 35 mm
● Dimensions of the wiring terminal: width ≤ 43 mm; length ≤ 136.5 mm; outer diameter of the
crimping tube ≤ 37 mm
Issue Draft A
(2022-09-07)
Type
Single-core outdoor
copper cable and M12
OT/DT terminals
Single-core or three-
core outdoor copper/
copper-clad
aluminum/aluminum
alloy cable and M12
OT/DT terminals
N/A
N/A
Three-core or four-
core outdoor copper
cable
Two-core or three-
core outdoor copper
cable
Single-core or three-
core outdoor copper/
copper-clad
aluminum/aluminum
alloy cable and
separable shielded
cable connectors
Copyright © Huawei Technologies Co., Ltd.
Cross-sectional
Outer Diameter
Area
2
10–32 mm
50–240 mm
16–72 mm
2
50–240 mm
N/A
N/A
N/A
N/A
10–32 mm
2
2.5–16 mm
2
6–20 mm
2.5–10 mm
Single-core: 30–
2
70–300 mm
52 mm
Three-core: 30–
95 mm
2
or 400 mm
3 Electrical Connections
Source
Prepared by
the
customer
Prepared by
the
customer
Delivered
with the
product
Delivered
with the
product
Prepared by
the
customer
Prepared by
the
customer
Prepared by
the
customer
Prepared by
the
customer
2
single-core cable. The
36

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jupiter-6000k-h1Jupiter-9000k-h1

Table of Contents