Commissioning
8.2 Basic commissioning procedure
8.2.1

Requirements

The following requirements must be met before you commission the Open Controller for the
first time:
• The CPU 1515SP PC2 is mounted.
• The supplied CFast card is inserted.
• No data carriers are connected via USB.
8.2.2

Preparing commissioning

Procedure
When the requirements are met, proceed as follows with the commissioning:
1. Connect a monitor using a DisplayPort cable.
2. Connect a keyboard and a mouse to the CPU via USB.
Result
The Open Controller is prepared for commissioning.
8.2.3

Commissioning procedure

When you start up your CPU 1515SP PC2 for the first time, basic settings and the administrator
password are queried. The device is then automatically set up for the operating system that is
installed on the CFast card. Restart the device after the operating system has been set up.
Note
The initial commissioning is not possible with a Multitouch panel, as the Multitouch driver is only
available after the installation of the operating system.
Procedure
When the requirements (Page 48) are met and the preparations for commissioning (Page 48) are
complete, proceed as follows with the commissioning:
1. Connect the power supply.
→ The PWR LED lights up yellow first, then green.
→ The device carries out the hardware initialization.
2. Wait until the Siemens logo disappears from the screen.