Hitachi Relion REB670 Commissioning Manual page 123

Table of Contents

Advertisement

1MRK 505 372-UEN Rev. K
10.8.3.2
Completing the test
Continue to test another function or end the test by changing the TestMode setting to Off. Restore
connections and settings to their original values, if they were changed for testing purposes.
10.8.4
Current based delta supervision DELISPVC
Prepare the IED for verification of settings outlined in Section
10.8.4.1
Verifying the signals and settings
Make sure that the function is connected to SMAI function with I3P signal.
Delta supervision function has four different modes of operation. Proceed as follows to test the
function in a particular mode.
1.
Set the following parameters:
2.
Set the constant current input of IL1 = 1A at 0° and IL2 = 1A at 120° and IL3 at -120°
secondary at rated frequency.
3.
Based on the mode of operation, carry out the following changes on input condition of Step
detect start condition.
Each mode is given for increase and decrease operation. (3-a and 3-b)
Step No.
3-a
3-b
3-a
3-b
4.
Repeat Step
10.8.4.2
Completing the test
Continue to test another function or end the test by changing the TestMode setting to Off. Restore
connections and settings to their original values, if they were changed for testing purposes.
10.8.5
Delta supervision of real input DELSPVC
Prepare the IED for verification of settings outlined in Section
Busbar protection REB670
Commissioning manual
Operation = ON
MeasMode = Phase-to-ground
Imin = 10% of IBase
DelI> = 80% of IBase
DeltaT = 2
tHold = 100
OpMode
Changes after step 2
Instantaneous 1
cycle or
Instantaneous 2
cycle
Instantaneous 1
cycle or
Instantaneous 2
cycle
RMS or DFT Mag
RMS or DFT Mag
3
with IL2 changes for different mode.
© 2017 - 2022 Hitachi Energy. All rights reserved
Change IL1 to 2 A
Change IL1 back to 1A
Change IL1 to 2 A
Change IL1 back to 1A
Testing functionality by secondary injection
GUID-2FE5E5F0-0E6C-499E-93D2-471C183B89BF v2
GUID-9EAEFF02-62C2-4FA7-8F3D-E92391206F7F v2
"Preparing the IED to verify
GUID-86324E4D-E054-495F-9D64-29741FBD8CBE v2
Expected output
STL1 , STRISE, START signal should be
TRUE for 100 ms
STL1 , STLOW, START signal should be
TRUE for 100 ms
STL1, STRISE, START signal should be
TRUE for 100 ms
STL1 , STLOW, START signal should be
TRUE for 100 ms
GUID-2FE5E5F0-0E6C-499E-93D2-471C183B89BF v2
GUID-86ADAAC5-B6D3-46FE-A090-81F7C90A31A7 v1
"Preparing the IED to verify
Section 10
settings".
2
to
settings".
117

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion 670 series

Table of Contents