Section 10
Testing functionality by secondary injection
10.6.1.2
Completing the test
Continue to test another function or end the test by changing the TESTMODE setting to Off. Restore
connections and settings to the original values, if changed for testing purposes.
10.6.2
Overfrequency protection SAPTOF
Prepare the IED for verification of settings outlined in Section
10.6.2.1
Verifying the settings
Verification of START value and time delay to operate
1.
Check that the IED settings are appropriate, for example the start value and the time delay.
2.
Supply the IED with three-phase voltages at their rated values and initial frequency.
3.
Slowly increase the frequency of the applied voltage with a 40 mHz step, applying it for a
period that is 10% longer than tDelay.
4.
Note the operate value and compare it with the set value.
5.
Decrease the frequency to rated operating conditions.
6.
Check that the START signal resets.
7.
Set the frequency to 20 mHz under the operate value.
8.
Increase the frequency with a 40 mHz step, applying it for a period that is 10% longer than
tDelay.
9.
Measure the time delay for the TRIP signal, and compare it with the set value. Note that the
measured time consists of the set value for time delay plus minimum operate time of the start
function (80 - 90 ms).
Extended testing
1.
The test above can be repeated to check the time to reset.
Verification of the low voltage magnitude blocking
1.
Check that the settings in the IED are appropriate, for example the StartFrequency and the
tDelay.
2.
Supply the IED with three-phase voltages at their rated values.
3.
Slowly decrease the magnitude of the applied voltage, until the BLKDMAGN signal appears.
4.
Note the voltage magnitude value and compare it with the set value.
5.
Slowly increase the frequency of the applied voltage, to a value above StartFrequency.
6.
Check that the START signal does not appear.
7.
Wait for a time corresponding to tDelay, make sure that the TRIP signal does not appear.
10.6.2.2
Completing the test
Continue to test another function or end the test by changing the TESTMODE setting to Off. Restore
connections and settings to the original values, if changed for testing purposes.
10.6.3
Rate-of-change frequency protection SAPFRC
Prepare the IED for verification of settings as outlined in section
section
108
"Preparing for test"
in this chapter.
© 2017 - 2022 Hitachi Energy. All rights reserved
1MRK 505 372-UEN Rev. K
"Preparing the IED to verify
"Requirements"
and
Busbar protection REB670
Commissioning manual
M16289-57 v5
M16290-2 v7
settings".
M16290-12 v2
M16290-14 v6
M16290-28 v4
M16290-34 v6
M16290-52 v5
M16256-2 v6