Hitachi Relion REB670 Commissioning Manual page 122

Table of Contents

Advertisement

Section 10
Testing functionality by secondary injection
10.8.2.1
Completing the test
Continue to test another function or end the test by changing the TESTMODE setting to Off. Restore
connections and settings to the original values, if changed for testing purposes.
10.8.3
Voltage based delta supervision DELVSPVC
Prepare the IED for verification of settings outlined in Section
10.8.3.1
Verifying the signals and settings
Make sure that the function is connected to SMAI function with U3P signal.
Delta supervision function has 6 different modes of operation. Proceed as follows to test the function
in a particular mode.
1.
Set the following parameters:
2.
Set the constant voltage input of UL1 = 63.5V at 0° and UL2 = 63.5V at 120° and UL3 at 63.5
-120° secondary at rated frequency.
3.
Based on the mode of operation, carry out the following changes on input condition of Step
detect start condition.
Each mode is given for increase and decrease operation. (3-a and 3-b)
Step No.
3-a
3-b
3-a
3-b
3-a
3-b
4.
Repeat Step
116
Operation = On
MeasMode = Phase-to-ground
Umin = 10% of UBase
DelU> = 50% of UBase
DelUang> = 10°
DeltaT = 2
tHold = 100
OpMode
Changes after step 2
Instantaneous 1
cycle or
Instantaneous 2
cycle
Instantaneous 1
cycle or
Instantaneous 2
cycle
RMS or DFT Mag
RMS or DFT Mag
DFT Angle (vector
shift)
DFT Angle (Vector
shift)
3
with UL2 changes for different mode.
© 2017 - 2022 Hitachi Energy. All rights reserved
Change UL1 to 20V
Change UL1 back to 63.5V
Change UL1 to 20V
Change UL1 back to 63.5V
Change UL1 to 63.5V at
15° without changing
frequency
Change UL1 to 63.5V at 0°
without changing frequency
1MRK 505 372-UEN Rev. K
GUID-38A57549-E6BF-46CB-ADFB-79305684EB67 v1
GUID-FBFEC9C5-1B76-4688-A00D-9EEB33326966 v1
"Preparing the IED to verify
GUID-B05EE7E5-2360-4036-991A-00747C47A625 v2
Expected output
STL1 , STLOW, START signal should be
TRUE for 100 ms
STL1 , STRISE, START signal should be
TRUE for 100 ms
STL1, STLOW, START signal should be
TRUE for 100 ms
STL1 , STRISE, START signal should be
TRUE for 100 ms
STL1, START signal will be TRUE for 100
ms.
STL1, START signal will be TRUE for 100
ms
Busbar protection REB670
Commissioning manual
settings".
2
to

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion 670 series

Table of Contents