Information - Tools Required; Check For Deliveries; Cabinet Top; Figure 4 Cabinet Top - ABB G390 Quick Start Manual

Table of Contents

Advertisement

QUICK START GUIDE
Information – Tools Required
Regulations, standards, site engineering instructions etc. take precedence over these general installation
instructions.
Steel toe safety shoes
Torque wrench - 0-65 in-lb (0-10 Nm) and 40 ft-lbs
Volt Meter for Lock-Out Tag-Out procedures

Check for deliveries:

Make sure that the box contains the
8x #6-32 Screws (CC408578537)
6x 60A Fuses (4600482350P)
6x Fuse Covers (4600480552P)
9x #4-40 Nuts (CC408578388)

Cabinet Top

The top of the Edge cabinet is shown here. The relevant areas are noted:
1.
AC input panel which contains two twist-n-lock AC input receptacles for AC input power.
2. Center back panel to be removed and replaced with Edge AC current limiter G390 assembly.
AC input panel
with two
twist-n-lock
receptacles
Page 8
© 2023 ABB. All rights reserved.
Sockets - as needed for mounting hardware
Screwdrivers - #2 pozi drive screwdriver. Flat and Torx bit
set with security pin
Two AC input
cords with
twist-n-lock
Center-Back Panel
plugs

Figure 4 Cabinet top

Edge_I-lim_G390_QSG
Version. 2.0

Advertisement

Table of Contents
loading

This manual is also suitable for:

1600480775a

Table of Contents