Section Two Installing And Interfacing The 2505; Before Installing The 2505 - NorthStar 2505 Installation Manual

Beacon/waas position sensor
Table of Contents

Advertisement

Before installing
the 2505
2505 INSTALLATION MANUAL, Revision A
SECTION TWO
Installing and
interfacing the
2505
T
his section explains how to install the 2505, including
recommended mounting locations and methods, and how to
interface and troubleshoot.
As shipped, the 2505 is ready to install and operate.
1.
Check the shipping carton for any damage, and
immediately report any damage to the carrier. Save all
packing material in case you have to return the 2505 to
the factory for repair or evaluation.
2.
Unpack the carton, and compare its contents with those
on the packing list and what you ordered. Table 2 on
page 12 lists the parts contained in the shipping carton.
Page 11

Advertisement

Table of Contents
loading

Table of Contents