ABB Infinity S Quick Start Manual
Hide thumbs Also See for Infinity S:

Advertisement

Quick Links

QUICK START GUIDE
Infinity S (NE-S) –48V System
19"/23"
AC input
wide
AC1 = Molex
AC3 = IEC 320 C19
AC5 = Term Block
AC6 = 3-Phase Term Block (19" only)
Cable crimpers
Torque wrench (0-240 in-lb / 28 Nm)
Screw Drivers (# 1 Flat & # 2 Phillips )
Mount the system with a minimum gap of 3 inches behind the system to allow proper airflow.
1.
Attach the system to the frame using a minimum of twelve (six on each side) 12-24 screws (provided).
Torque to 35 in-lb (7.3 Nm) - 5/16" socket.
Page 1
© 2021 ABB. All rights reserved.
NES48-23-AC1-PS4-DC1E-LVBD
# of Power
Slots
5/16," 7/16" and 1/2" nut drivers
Wire cutters and strippers
# of Distribution
Panels (1 or 2)
LVBD
option

Advertisement

loading

Summary of Contents for ABB Infinity S

  • Page 1 QUICK START GUIDE Infinity S (NE-S) –48V System NES48-23-AC1-PS4-DC1E-LVBD 19”/23” AC input # of Power # of Distribution LVBD wide AC1 = Molex Panels (1 or 2) Slots option AC3 = IEC 320 C19 AC5 = Term Block AC6 = 3-Phase Term Block (19” only) •...
  • Page 2 Battery Returns DC Reference (CO) Ground 23” Direct Battery Connections Chassis Ground AC inputs 3, 4 AC inputs 1, 2 DC Reference (CO) Ground 19” AC cover removed AC inputs Chassis Ground Page 2 © 2021 ABB. All rights reserved.
  • Page 3 Load connections are made to bullet-style distribution positions Distribution panels are each equipped with 20 (19” panel) or 26 (23” Breaker sizes up to 250A, TPS fuses to 70A and GMT fuses to 12A are Page 3 © 2021 ABB. All rights reserved.
  • Page 4 Correct Breaker orientation for insertion Two multi-pole adapters are required for each multi-pole breaker - figure below. Load Return Connections (Bus behind Load Connections) Return Bus Adapters Face lug studs to the rear. Load Connections Page 4 © 2021 ABB. All rights reserved.
  • Page 5 Pulsar Plus - Connect to J1, J2, J3, J4, and J5. See Information Controller Connections. All controller connections are accessible on the left side of the controller, with the controller installed. Millennium II - see Galaxy Millennium II Controller Users Guide for details. Page 5 © 2021 ABB. All rights reserved.
  • Page 6: Step 7 - Rectifier Installation

    Step 9 - Configure Controller Verify and edit controller basic configuration parameters per site engineering instructions. Pulsar Plus - per Galaxy Pulsar Plus Product Manual Millennium II - per Galaxy Millennium II Controller Users Guide Page 6 © 2021 ABB. All rights reserved.
  • Page 7 Settings Tab > Battery Management for Battery Type and number of battery strings installed. Plant Status LEDs Craft Port behind door LCD Display Voltage Menu Test Jacks Navigation Front Display Menu Map Front Display Page 7 © 2021 ABB. All rights reserved.
  • Page 8 Battery Monitoring is accomplished with a “Daisy Chained” series of probes connected to J2. The Probes monitor battery temperature and voltage (ES771 required to monitor voltage). Bolt the Probe under the “–“ terminal connector hardware; NOT under the connecting lug. Page 8 © 2021 ABB. All rights reserved.
  • Page 9 QUICK START GUIDE Temperature Measurement Ordering Codes Descriptions CC109142980 QS873A Thermal Probe Temperature and Voltage Measurement Ordering Codes Descriptions ES771A Voltage Monitor Card G 10’ ES771A to ES771A or controller wireset Page 9 © 2021 ABB. All rights reserved.
  • Page 10 BL/R BK/R R/BK Alarm Inputs Default alarm descriptions may be changed as needed using web pages or Easyview2. J4 is a 10-pin latching connector. Standard Controller Alarm Input Defaults J3 Pin Color Page 10 © 2021 ABB. All rights reserved.
  • Page 11 5 ft. Information: Rectifier Options Recommended AC Breaker Rectifier Input ac 200-240 Vac Eco Rectifier dc +/-30 to +/-150) Vdc, 11A max NE075AC48ATEZ 75A with AC5 and AC6, 50A with AC1 and AC3. Page 11 © 2021 ABB. All rights reserved.
  • Page 12 QUICK START GUIDE • Specifications and ordering information are in the Infinity S Ordering Guide available at abbpowerconversion.com • External Surge Protective Device (SPD) is required on all AC inputs. • Equipment and subassembly ports: 1. are suitable for connection to intra-building or unexposed wiring or cabling;...
  • Page 13: Safety Statements

    Grounding - Connect the equipment chassis directly to ground. In enclosed equipment cabinets connect to the cabinet AC service ground bus. In huts, vaults, and central offices connect to the system bonding network. Page 13 © 2021 ABB. All rights reserved.
  • Page 14 Personnel with electronic medical devices need to be aware that proximity to DC power and distribution systems, including batteries and cables, typically found in telecommunications utility rooms, can affect medical electronic devices, such as pacemakers. Effects decrease with distance. Page 14 © 2021 ABB. All rights reserved.
  • Page 15 QUICK START GUIDE Notes Page 15 © 2021 ABB. All rights reserved.