1MRK 511 396-UEN E
Section 6
6.1
Establishing connection and verifying the SPA/IEC
communication
About this chapter
This chapter contains instructions on how to establish connection and verify that the SPA/IEC
communication operates as intended when the IED is connected to a monitoring or control
system via the rear SPA/IEC port.
6.1.1
Entering settings
If the IED is connected to a monitoring or control system via the rear SPA/IEC103 port, the
SPA/IEC103 port has to be set either for SPA or IEC103 use.
6.1.1.1
Entering SPA settings
The SPA/IEC port is located on the rear side of the IED. Two types of interfaces can be used:
•
plastic fibers with connector type HFBR
•
glass fibers with connector type ST
When using the SPA protocol, the rear SPA/IEC port must be set for SPA use.
Procedure:
1.
Set the port for SPA use on the local HMI under Main menu /Configuration /
Communication /Station communication/Port configuration/SLM optical serial port/
PROTOCOL:1. When the communication protocol is selected, the IED is automatically
restarted, and the port then operates as a SPA port.
2.
Set the
menu/Configuration/Communication/Station communication/SPA/SPA:1. Use the
same settings for these as is set in the SMS system for the IED.
6.1.2
Verifying the communication
To verify that the rear communication with the SMS/SCS system is working, there are some
different methods. Choose one of the following.
6.1.2.1
Verifying SPA communication
Procedure
SPA, 670 series
Communication protocol manual
Establishing connection and
verifying the SPA/IEC
communication
SlaveAddress and BaudRate for the rear SPA port on the local HMI under Main
© Copyright 2017 ABB. All rights reserved
Establishing connection and verifying the SPA/IEC communication
Section 6
IP371 v2
M11735-2 v2
M11735-7 v6
M11735-77 v1
M11735-81 v5
23