Installation Of The Drawout Handle; Installation Of The Inter-Phase Barrier (Ba) - Mitsubishi Electric AE-SW Series Instruction Manual

Hide thumbs Also See for AE-SW Series:
Table of Contents

Advertisement

Installation of the drawout handle

The drawout handle can be installed either onto the right or left of the cradle as required.
A drawout handle, installation bracket, installation screws, and hexagon nuts are provided with the breaker.
Installation onto the left side
Installation bracket
Cradle
Fig. 9-1

Installation of the inter-phase barrier (BA)

Insert in the slot on the breaker. (Refer to Fig. 9-4 and Fig. 9-5)
< Fixed type >
Fig. 9-4
Installation onto the right side
Drawout handle
Hexagon nut M5 (supplied)
Installation screw (+) M5 × 12 (supplied)
Tightenning torque:3.2 ± 0.4 N m
Fig. 9-2
< Drawout type >
Fig. 9-5
Note) When a mechanical interlock (MI) or
door interlock (DI) is attached, the dra-
wout handle cannot be installed onto
the right side of the cradle.
Mechanical interlock (MI)
or Door interlock (DI)
Fig. 9-3
E-9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents