10. Lubricate and install the 1-5/16" o-ring into
the valve body. (See Figure 86.)
11. Install the discharge tube onto the smaller
opening in the valve body by aligning the
flats on the discharge tube with the
locking grooves on the valve body. Push
down the discharge tube until it is seated
into the valve body opening. Turn the
discharge tube clockwise to fully engage it
into locking grooves on the valve body.
12. Install the cylinder onto the larger opening
in the valve body by tilting the cylinder
away from the discharge tube and sliding
the widest section of flange under the
center locking groove on the valve body.
Align the tabs on the cylinder with the
locking grooves on the valve body. Turn
the cylinder clockwise until the tabs fully
engage into the locking grooves on the
valve body.
13. Install the lid by inserting the discharge
tube through the smaller hole in the lid.
Slide the lid until the larger hole fits
around the top of the cylinder. The
discharge tube lock nut will secure the lid
in position.
14. Install the discharge tube lock nut.
Tighten the lock nut by turning it
clockwise.
Downloaded from
www.dlmanuals.com
Figure 86
15. Lubricate and install the plunger assembly
into the cylinder opening in the pump
body. (See Figure 87.)
16. Tighten the plunger nut by turning it
clockwise. (See Figure 88.)
MANUAL BRUSH CLEANING
This Procedure Must Be Completed Every Two
Weeks!
ALWAYS FOLLOW LOCAL HEALTH CODES.
To disassemble the Model C602, the following
items will be needed:
S
Two cleaning and sanitizing pails for
each side of the freezer
S
Necessary brushes (provided with
freezer)
S
McD All Purpose Super Concentrate
(APSC) (HCS)
S
McD Sanitizer (HCS)
S
Clean, sanitized towels
S
Parts trays
54
Figure 87
Figure 88
Need help?
Do you have a question about the McDonald's C602 and is the answer not in the manual?
Questions and answers