No.S001 Pre-fab. Module Base Installation Position Diagram
Note:
1. The concrete platform needs to support a pre-fab. module with the maximum weight of 25,000 kg. The
recommended anti-seismic acceleration is 3g. Calculate the strength of the concrete platform based on
the contact area (refer to the 1720 cm² area of a single-capacity base installed on the ground). Take an
engineering margin into consideration.
2. Each base has eight mounting holes. Only four holes need to be used, preferably the outer four holes. If
an outer hole is on the top of groundwork reinforcing steel bars, select the inner hole instead.
3. During installation, ensure that the direction of the single-capacity base is the same as the drawing.
4. Reserve two cable outlets for power cables at the shown positions on the ground. It is recommended
that the cable outlets be made of steel pipes or PVC pipes with an inner diameter of not less than Ø100
mm and a reserved height of 500 mm aboveground.
\
12,192
3,902.2
12,414
>=\
Single-capacity base
Concrete platform
Ground
Concrete platform
Drawing No.
Item
Single-capacity
DKBA40703508
base
T-shaped bolt
DKBA80473086
DKBA04802828_M16×
Expansion bolt
150_S
400
340
260
Steel base
\
Quantity
Unit
4
PCS
4
PCS
16
PCS