Hitachi RWM-2R1E Installation & Operation Manual page 81

And yutaki cascade controller
Hide thumbs Also See for RWM-2R1E:
Table of Contents

Advertisement

UNIT CONTROLLER
Detailed information about Boiler combination:
• Operation (Demand ON/OFF)
• Current temperature
• Setting temperature
Detailed information about Solar combination:
• Operation (Demand ON/OFF)
• Solal Panel temperature
Detailed information about Communication
status:
• H-Link
• H-Link Central
• RCS Central
• Cascade Controller
71
PMML0575 rev.1 - 09/2021
3 / 4
4 / 4
Detailed information about Electrical
Heater:
• Operation (Demand ON/OFF)
• Current temperature
• Setting temperature
• Load Factor
• Step
Shows a list of the alarm history of the
system

Advertisement

Table of Contents
loading

Table of Contents