ABB TPL69-A33 Series Operation Manual page 61

Hide thumbs Also See for TPL69-A33 Series:
Table of Contents

Advertisement

5.4.1
© Copyright 2016 ABB. All rights reserved.
Operation Manual / TPL65-A32 / -A33 / -A36 + TPL69-A32 / -A33
Maintenance
Cleaning turbine blades and nozzle ring
in operation
Wet cleaning turbine and nozzle ring during operation
Prerequisites for turbine wet cleaning
In the case of V-engines with several turbochargers on each engine, we
recommend parallel cleaning of both turbochargers. This cleaning process
is faster and the risk of turbocharger surging is reduced. We recommend
finding the most suitable method by performing trials.
Recommended operating state for turbine wet cleaning
The following operating state and prerequisites have been tested and ap-
proved by ABB Turbo Systems for the cleaning process:
The engine has just been started or the engine load has been reduced
as far as possible (best cleaning is achieved at a load level of roughly
10 ... 15%).
As soon as the turbine inlet temperature is stable and below 430°C,
wait at least another 10 minutes for the charger parts to cool down.
Start cleaning cycle according to following description Wet cleaning
procedure.
5
5.4
Page 59

Advertisement

Table of Contents
loading

Table of Contents