2 Control Functions
Control functions on the module

2.1.11 External thermo operation from external contact

In case of setting the chiller unit to run/stop with the order of an external contact such as that of a (locally supplied)
external thermo, capacity control function is disabled and operation is performed at 100% load. This function is mainly
oriented to thermal storage operation.
It is not possible to use this function together with the function to control the number of units.

Setting method
1 Set the local/remote switch (SW2 on PCBa) to remote side.
2 Connect the forced load operation switch to [24]-[25] of terminal block.
3 The wiring side used together by normal remote operation (air conditioning operation) and forced load operation
(thermal storage operation) is shown.
Local
Switch
SW2
PBSR2
(OFF)

Time chart
Forced load
operation
switch
?
N O T E
Forced load run/stop from local external contact cannot be performed by pulse signal.
Normal operation order and thermal storage order must be input to the chiller unit separately.
For local external contact orders, ensure a minimum interval of 5 minutes of continuous operation order (5 minutes of stop time, too).
For the additional wiring, put it separately inside a metallic pipe, or use a shielded wire.
Always operate the air conditioning/thermal storage switch while the chiller unit is stopped.
23
SMGB0120 rev.0 - 11/2017
Remove the wiring between
5 and 6 if it is connected
5
6
7
Air conditioning
(Thermal storage)
Switch between air conditioning
PBSR1
(OFF)
2 0V
3
ON
OFF
Keep more than
Run
Chiller
unit
Stop
(Air conditioning)
and thermal storage
Keep more than
5 minutes
5 minutes
24
25
(Thermal
storage)
SW2
Forced
load
operation
switch
2 0V
3
2