Introduction; Minimum Requirements; Ac Mains - Wire Gauge - Hitachi EC702MP-BB3 Operation Manual

Uhf digital tv transmitters
Table of Contents

Advertisement

1. Introduction

This section provides information on the minimum installation requirements for ATSC E-
Compact Series transmitters with recommendations on shelter, tower, antennas, cables,
grounding, mains, transient preventions, etc.

2. Minimum Requirements

2.1. AC Mains - Wire Gauge

The following details the consumption with the equipment running at its maximum power.
Current (A) on each wire:
M110
110VAC ±15%
Between Phase and
Neutral
MODEL
(A)
EC702MP-BB3
8.6
EC704MP-BB3*
14.3
Not available or uncommonly used
*EC704MP-BB3 operates on M110 electrical network using two PSUs.
The current values specified in the table are according to the load of each phase, which
will determine the size of the conductors and protection.
Said gauge is the minimum recommended for the transmitter in question, if the cable
length is longer, consider a voltage drop in the cable maximum of 5%.
The section of the neutral conductor should be the same as the phase.
The section of the ground conductor must be the same as the conductor's phase.
M220
220VAC ±15%
Between Phase B
220VAC ±15%
(Wild Leg) and
Between 2-Phases
Neutral
AC load for infrastructure install (A) - E-Compact Series - ATSC
M110
M220 / B220
Wire Gauge
(A)
mm²
AWG
4.17
11
5.0
6.63
9
8.2
B220
T220
220VAC ±15%
Between 3-Phases.
T220
Wire Gauge
Wire Gauge
(A)
mm²
AWG
mm²
3.31
12
4.17
11
E-Compact MP-BB3 Series
T380
380VAC ±15%
Between 3 Phases
220VAC ±15%
Between each
Phases and Neutral
T380
Wire Gauge
(A)
Typical
AWG
mm²
AWG
14 | 108

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ec704mp-bb3

Table of Contents