DISASSEMBLY PROCEDURE
15. How to remove the flow switch
(1) Pull out the module unit assy. (Refer to Procedure 11.)
(2) Remove the module box front. (Refer to Procedure 13-2.)
(3) Remove the module box top and the module box side R.
(Refer to Procedure 13-3.)
(4) Disconnect the relay connector of the flow switch.
(5) Remove the band C. (Photo 14-1)
(6) Release the lead wires from the clamp on the brine pump
base. (Photo 15)
(7) Remove the flow switch. (Photo 15)
Note:
Tightening torque of the flow switch: 8 ± 1 N▪m
16. How to remove the booster heater
(1) Pull out the module unit assy. (Refer to Procedure 11.)
(2) Remove the module box front. (Refer to Procedure 13-2.)
(3) Remove the module box top and the module box side R.
(Refer to Procedure 13-3.)
(4) Remove the flexible pipe (brine in). (Refer to Procedure
13-6).
(5) Remove the THW1 lead wire. (Photo 16-1)
(6) Release the lead wires from the clamp on B.H stay.
(Photo 16-1)
(7) Disconnect the relay connector of the booster heater.
(8) Remove the band C. (Photo 14-1)
(9) Remove the pipes (pipe and the flexible pipe) connected
with an elbow from the booster heater (the fastener and
the O-ring). (Photo 16-1)
(10) Remove the fastener and the O-ring on the pipe BH
WPHEX side from the booster heater. (Photo 16-1)
(11) Remove the booster heater assy (2 screws 4×10). (Photo
16-2)
(12) Remove the booster heater from the B.H stay (3 screws
4×8). (Photo 16-3)
OCH722A
PHOTOS/ FIGURES
Photo 15
Relay connector
Brine pump base
Photo 16-1
Pipe BH WPHEX
Pipes
(pipe and the
flexible pipe)
Fastener on the pipe BH WPHEX side
Photo 16-2
Flexible pipe
(Brine in)
Relay connector
Photo 16-3
88
Flow
Clamp
switch
Clamp on B.H stay
Elbow
Fastener and O-ring
on the booster heater
THW1
Elbow
Screws 4×10
Fastener and O-ring on
the flexible pipe side
Screws 4×8