Mitsubishi Electric EHGT17D-YM9ED Service Manual page 12

Table of Contents

Advertisement

Symbol
Name
TB1
Terminal block (Power supply)
ECB1
Earth leakage circuit breaker for booster heater
Earth leakage circuit breaker for immersion heater
ECB2
(Option)
Water circulation pump 1
MP1
(Space heating & DHW)
Water circulation pump 2
MP2
(Space heating for Zone1)(Local supply)
Water circulation pump 3
MP3
(Space heating for Zone2)(Local supply)
MP4
Water circulation pump 4 (DHW)
3WV
3-way valve
2WV2a
2-way valve (For Zone 1)(Local supply)
2WV2b
2-way valve (For Zone 2)(Local supply)
MXV
Mixing valve (Local supply)
BHT
Thermostat for booster heater
BHF
Thermal fuse for booster heater
BH1
Booster heater 1
BH2
Booster heater 2
BHC1
Contactor for booster heater 1
BHC2
Contactor for booster heater 2
BHCP
Contactor for booster heater protection
Thermostat (fixed temp.) for immersion heater
IHT
(Option)
IH
Immersion heater (Option)
IHC
Contactor for immersion heater (Option)
TH1
Thermistor (Room temp.)(Option)
TH2
Thermistor (Ref. liquid temp.)
THW1
Thermistor (Flow water temp.)
THW2
Thermistor (Return water temp.)
THW5A
Thermistor (DHW tank upper water temp.)
THW5B
Thermistor (DHW tank lower water temp.)
THW6
Thermistor (Zone1 flow water temp.)(Option)
THW7
Thermistor (Zone1 return water temp.)(Option)
THW8
Thermistor (Zone2 flow water temp.)(Option)
THW9
Thermistor (Zone2 return water temp.)(Option)
THW10
Thermistor (Mixing tank water temp.)(Option)
THWB1
Thermistor (Boiler flow water temp.)(Option)
IN1
Room thermostat 1 input (Local supply)
IN2
Flow switch 1 input (Local supply)
IN3
Flow switch 2 input (Zone1)(Local supply)
IN4
Demand control input (Local supply)
IN5
Outdoor thermostat input (Local supply)
IN6
Room thermostat 2 input (Local supply)
IN7
Flow switch 3 input (Zone2)(Local supply)
IN8
Electric energy meter 1 (Local supply)
IN9
Electric energy meter 2 (Local supply)
IN10
Heat meter (Local supply)
IN11
Smart grid ready input (Local supply)
IN12
OUTA1
Analog output
FTC
FLOW TEMP. CONTROLLER
TBO.1-4 Terminal block (Outputs)
Terminal block (Signal inputs, Thermistor inputs,
TBI.1-6
Output)
F1
Fuse (IEC T10AL250V)
F2
Fuse (IEC T6.3AL250V)
SW1-6
DIP switch *See Table 3
X1- 16
Relay
LED1
Power supply (FTC)
LED2
Power supply (Main remote controller)
LED3
Communication (FTC-C.B.)
LED4
Reading or writing data to SD card
CNPWM Pump speed control signal for MP1
CN108
SD card connector
Table 1 Signal inputs
Name
Terminal block
Connector
Item
Room thermostat
IN1
TBI.1 7-8
1 input *9
Flow switch 1
IN2
TBI.1 5-6
input
Flow switch 2
IN3
TBI.1 3-4
input (Zone1)
Demand control
IN4
TBI.1 1-2
input
Outdoor thermo-
IN5
TBI.2 7-8
stat input *10
Room thermostat
IN6
TBI.2 5-6
2 input *9
Flow switch 3
IN7
TBI.2 3-4
input (Zone2)
Electric energy
IN8
TBI.3 7-8
meter 1
Electric energy
IN9
TBI.3 5-6
meter 2
IN10
TBI.2 1-2
Heat meter
Smart grid ready
IN11
TBI.3 3-4
IN12
TBI.3 1-2
input
INA1
TBI.4 1-3
CN1A
Flow sensor
*9. Set the ON/OFF cycle time of the room thermostat for 10 minutes or more;
otherwise the compressor may be damaged.
*10.If using outdoor thermostat for controlling operation of heaters, the lifetime
of the heaters and related parts may be reduced.
*11.To turn on the boiler operation, use the main remote controller to select
"Boiler" in "External input setting" screen in the service menu.
OCH722A
Symbol
Name
MC
Motor for Compressor
MBP
Brine Pump Motor
63H
High Pressure Switch
63L
Flow Switch
63HS
High Pressure Sensor
TH3
Thermistor (Liquid)
TH4
Thermistor (Discharge)
TH7
Thermistor (Outdoor)
TH8
Thermistor (Heat Sink)
TH32
Thermistor (Brine Inlet)
TH33
Thermistor (Comp. Surface)
TH34
Thermistor (Brine Outlet)
LEV-A
Linear Expansion Valve
ACL1,ACL2,ACL3,ACL4
Reactor
CK
Capacitor
RS
Rush Current Protect Resistor
P.B.
Power Circuit Board
N.F.
Noise Filter Circuit Board
CONV.B.
Converter Circuit Board
C.B.
Controller Circuit Board
SW1
Switch (Function Switch)
SW4
Switch (Function Switch)
SW5
Switch (Function Switch)
SW6
Switch (Model Select, Function Switch)
SW7
Switch (Function Switch)
SW8
Switch (Function Switch)
SW9
Switch (Function Switch)
CNDM
Connector (Connection for Option)
SV1/CH
Connector
SV3/SS
Connector
21S4
Connector
LED1,LED2
LED (Operation Inspection Indicators)
F3, F4
Fuse (T6.3AL250V)
X51,X52,X54
Relay
OFF (Open)
ON (Short)
Refer to SW2-1 in
<Table 9.8.1 DIP Switch Functions>.
Refer to SW2-2 in
<Table 9.8.1 DIP Switch Functions>.
Refer to SW3-2 in
<Table 9.8.1 DIP Switch Functions>.
Heat source OFF/
Normal
Boiler operation *11
Standard opera-
Heater operation/
tion
Boiler operation *11
Refer to SW3-1 in
<Table 9.8.1 DIP Switch Functions>.
Refer to SW3-2 in
<Table 9.8.1 DIP Switch Functions>.
Refer to installation manual.
Table 2 Outputs
Name
Terminal block
Connector
Item
Water circulation pump 1 output
OUT1
TBO.1 1-2
CNP1
(Space heating & DHW)
Water circulation pump 2 output
OUT2
TBO.1 3-4
(Space heating for Zone1)
Water circulation pump 3 output
OUT3
TBO.1 5-6
(Space heating for Zone2) *12
2-way valve 2b output *13
OUT4
CN851
3-way valve output
TBO.2 1-2
OUT5
Mixing valve output *12
TBO.2 2-3
OUT6
CNBH 1-3
Booster heater 1 output
OUT7
CNBH 5-7
Booster heater 2 output
OUT8
TBO.4 7-8
OUT9
TBO.4 5-6
CNIH
Immersion heater output
OUT10 TBO.3 1-2
Boiler output
OUT11 TBO.3 5-6
Error output
OUT12 TBO.3 7-8
OUT13 TBO.4 3-4
2-way valve 2a output *13
Water circulation pump 4 output
OUT14
CNP4
(DHW)
OUT15 TBO.4 1-2
Comp. ON signal
OUT16 TBO.3 3-4
Heaing thermo ON signal
OUTA1 TBI.4 7-8
Analog output
Do not connect to the terminals that are indicated as "—" in the "Terminal block" field.
*12. For 2-zone temperature control.
*13. For 2-zone valve ON/OFF control.
12
OFF
ON
OFF
ON
OFF
ON
OFF
ON
Heating
DHW
Close
Stop
Open
OFF
ON
OFF
ON
OFF
ON
OFF
ON
Normal
Error
OFF
ON
OFF
ON
OFF
ON
OFF
ON

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ehgt17d-ym9ed.uk

Table of Contents