Download Print this page

ABB VM1 Installation And Service Instructions Manual page 5

Hide thumbs Also See for VM1:

Advertisement

M E D I U M V O LTA G E P R O D U C T S
1. Packing and transport
The circuit breaker is shipped in special packing,
in the open position.
Each piece of apparatus is protected by a plastic
cover to prevent any infiltration of water during
the loading and unloading stages and to keep the
dust off during storage.
5 5

Advertisement

loading

This manual is also suitable for:

Vm1 12Vm1 17Vm1 24