Mechanical installation for ACS580-01, ACH580-01 and ACQ580-01 67
Optional steps:
• If you wish to install the power cable shelf lower on the bottom bracket, first
remove the cover and lead-through plate.
• Then detach the power cable shelf and attach it to the bottom bracket with M4
nuts.