2.7 Checking the Device After Installation
Table 2-4
Installation Checklist in the appendix.
Table 2-4 Installation checklist
No.
1
2
3
4
5
6
7
8
2.8 Powering on the Device
After the device is powered on, observe indicator on the device to determine the system
running status. For details, see
Issue 01 (2016-09-30)
Bundled cables are closely arranged, straight, tidy, and undamaged.
Cable ties are bound neatly facing the same direction, and those at the same horizontal
line must be in a straight line. Cable tie tails should be cut smoothly and evenly.
Labels or nameplates must be attached to the cables after they are installed.
shows the items to be checked after installation is complete. For more details, see
Check Item
The device is installed by strictly following the design draft. The
installation position meets space requirements, with maintenance space
reserved.
The device is securely installed.
The power cables are intact and not spliced.
Terminals of the power cables are welded or cramped firmly.
All power cables are not short-circuited or reversely connected and must
be intact with no damage.
The power cables and ground cables are separated from other cables and
bundled separately.
Connectors of signal cables are complete, intact, and tightly connected.
The signal cables are not damaged or broken.
Labels on cables are clear and correct.
NOTE
Do not frequently power on and off the device.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.