Inserting The Sc/Apc Connector; Figure 11: Inserting The Sc/Apc Connector - Motorola GX2 EA1000C Series User Manual

Table of Contents

Advertisement

Installation and Setup

Inserting the SC/APC Connector

Before inserting the GX2-EA1000C*/* into the GX2-HSG*, insert the interface fiber
jumper SC/APC connector into the optical bulkhead fitting. It is recommended that you
use a short optical jumper for initial GX2-EA1000C*/* installation. This provides greater
flexibility for installation and can be used to verify the optical output power after the unit
is installed.
To insert the SC/APC connector into the optical bulkhead fitting:
1. Carefully open the shutter of the optical bulkhead fitting.
2. Align the key on the SC/APC connector with the mating key slot of the optical
bulkhead fitting. Figure 11 illustrates proper SC/APC alignment with the optical
bulkhead fitting:
3. Insert the SC/APC connector into the optical bulkhead fitting.
4. Push the SC/APC connector into the optical bulkhead fitting until it snaps in place.
GX2 EA1000C*/* Multi-Wavelength DWDM 1550 nm Laser Transmitter • User Guide
589569-001-a

Figure 11: Inserting the SC/APC connector

B
21

Advertisement

Table of Contents
loading

Table of Contents