Original installation and operation manual
10.2 Maintenance schedule
Maintenance
Wear parts exchange
Cleaning work
Visual inspection
Leakage test
10.3 Maintenance work
For maintenance work to be carried out, the following prerequisites must be fulfilled and the preparatory tasks must
have been completed.
Tools
•
Screwdrivers:
Cross-head size 2.5 mm (0.09")
Flat-blade size 2.5 mm (0.09")
•
e.g. adjustable spanner
•
Cleaning brush made of wire or soft
plastic material with
Ø max. = 1.5 mm (0.05")
Ø max. = 2.5 mm (0.09")
1.
Decommissioning and disassembly must have been completed.
10.3.1 Wear parts exchange
Illustration
Interval
Annually
Annually
Weekly
At the end of all assembly work and maintenance and
servicing work on the product
Prerequisites
Material
•
Sealants
•
Lubricant for greasing the O-rings
•
Mild detergent
•
Cotton cloth or disposable tissue
Preparatory tasks
Description / explanation
3
2. Loosen the 4 pan-head screws [3].
BEKOMAT
12, 12 CO, 12 CO PN63
®
Protective equipment
Always to be worn:
37 | 64