9
Software
9.1
Installation
ETS
1. Install the panel commissioning software from the current EIB database on a PC.
(from V.
2. Import the product database into the ETS.
1.3)
3. Configure the unit and set the parameters.
Power-
1. Install the panel commissioning software from the current EIB database or from the
Projekt 4.x
Power-Projekt CD.
2. Configure the unit and set the parameters (see above).
The EIB database can be purchased directly from ABB or downloaded from the Internet
at www.abb.com.
ENG
43